Sublime Installation Video - Chapter 1 - Investigation and Review of Existing Structure

More Views

Sublime Installation Video - Chapter 1 - Investigation and Review of Existing Structure
£5.00 (Excl. VAT)

Availability: In stock

Sublime Installation Video - Chapter 1 - Investigation and Review of Existing Structure

* Required Fields

£5.00 (Excl. VAT)
Every effort has been made to ensure the accuracy of the colour and texture of products on this website but due to the limitations of technology, we strongly recommend that sample products are purchased for testing in situ prior to the full order being placed.
Description

Details

Sublime Installation Video - Chapter 1 - Investigation and Review of Existing Structure
Benefits
  • Reduced overall excavation depths: When compared to a conventional Limecrete systems using a lightweight insulating slab layer plus higher density screed layer to contain the underfloor.
  • Reduced wet trades and processes: As only one wet mixed layer is required over the GLAPOR® glass gravel, it saves on labour and the cost of the materials when compared to previous systems.
  • Reduced curing times: By eliminating the need for two layers curing times are reduced by approximately 3 weeks.
  • Improved energy efficiency and response times of underfloor heating systems: As the insulation material is now directly beneath the heat source the heat drift associated with other systems is significantly reduced.
  • Reduced material quantities and therefore reduced delivery costs.
  • Winner of the Wales Regional LABC Building Excellence Award 2013 ‘Best Technical Innovation’.